Foundation Repair Contractors: Licence, Bid, Contract

What to verify before hiring a foundation repair contractor: state licence, insurance, written scope, payment schedule, and warranty terms.

Contractor and homeowner reviewing a foundation repair contract on a clipboard beside an exposed footing
Contractor and homeowner reviewing a foundation repair contract on a clipboard beside an exposed footing — Foundation Repair Lab
Quick answer

Hire a foundation repair contractor only after verifying the state licence, general liability and workers compensation insurance, a written scope with pier count, a deposit under one third, and a warranty you have read.

At a glance
Licence check
State database lookup
Insurance
Liability and workers comp
Deposit
Under one third
Warranty transfer
$100 - $500
Typical repair
$4,000 - $15,000

Some links on this page are affiliate links.If you buy through them we may earn a commission at no extra cost to you. We do not accept payment for rankings. Read the full disclosure.

Foundation repair contractors are licensed at the state level, insured at the company level, and judged on the contract they are willing to sign. Verify all three before work starts. A contractor with a valid licence, current insurance, and a scope that names the pier count is a different counterparty from one who offers a verbal price and a handshake.

Licence Verification

Most states license foundation and structural repair work under a general contractor or specialty classification. Ask for the licence number, then look it up in the state’s online database yourself. Check that the classification covers the work, that the licence is active, and that the name on the licence matches the name on the contract.

A licence number on a business card proves nothing. A licence search showing an active status, a matching business name, and no disciplinary actions is evidence. If the contractor is an unlicensed handyman offering structural work, the price will be attractive and the recourse will be nonexistent.

Insurance You Should See

Coverage What it protects How to verify
General liability Your property, third parties Certificate from the insurer
Workers compensation Injured crew members State coverage verification
Commercial auto Vehicles on your property Certificate, if vehicles enter
Umbrella Large losses above the base policy Certificate, if claimed

Ask to be named as certificate holder and have the certificate sent directly by the insurer. A photocopy can be altered; a direct certificate cannot. If a crew member is injured in your yard without workers compensation, the claim can follow the homeowner in some states.

The Written Scope

A usable scope names the method, the pier type, the count, the spacing, and the design depth. It states who pulls the permit, who pays for it, and what restoration is included. It lists exclusions explicitly, because the exclusions are where the surprises live.

Compare a weak scope with a strong one. “Install piers and stabilize foundation” gives you nothing. “Install eight push piers at 7-foot spacing, design depth 22 feet, engineer’s report included, permit included, interior crack repair excluded” gives you a contract you can enforce.

Payment and Change Orders

Milestone Typical share Note
Deposit 10% - 33% Materials and scheduling
Mobilization 25% - 40% Crew and equipment on site
Pier completion 25% - 40% Verified by count and depth
Final 10% - 20% After inspection and punch list

A deposit above one third on a residential job is unusual and worth questioning. So is a request for the balance before the lift is verified. Tie the final payment to the lift record and the inspection sign-off, and put that condition in the contract.

Change orders should be priced in advance. The common one is pier depth: if refusal comes deeper than design, the contractor charges per additional foot. Get that rate in writing before excavation, because once the hole is open the negotiation is one-sided.

A Costed Contract Review

A bid of $14,400 for eight push piers at $1,800 each looks straightforward:

8 × $1,800 = $14,400

Then read the exclusions. Engineering is extra at $900, the permit is extra at $350, and interior crack repair is extra at $1,200. The real number is:

$14,400 + $900 + $350 + $1,200 = $16,850

That is 17% above the headline figure and still inside the $4,000 to $15,000 repair band once you account for the restoration being optional. The point is not that the add-ons are unfair; it is that they should be visible before you sign.

Questions to Ask on the Walkthrough

  1. Who wrote the scope, and may I see the engineer’s report?
  2. How many piers, at what spacing, and to what design depth?
  3. What is the per-foot charge if refusal comes deeper than design?
  4. Who pulls the permit, and what is the inspection sequence?
  5. What does the warranty cover, and what voids it?
  6. What is the payment schedule, and what triggers each draw?

Red Flags in the Contract

A contract with no completion date, no pier count, and no warranty language is not a contract; it is an estimate with a signature line. A clause that requires binding arbitration and waives your right to inspect is worth a lawyer’s read. And a warranty that is “lifetime” but not transferable is worth less at resale than it sounds.

For the hiring sequence, see contractor licence check and foundation repair red flags. If the contractor is proposing a method you have not researched, underpinning cost and wall anchor cost give the unit prices to compare against.

One last document is worth requesting at final payment: a lien waiver from the contractor and from any material supplier who delivered steel or concrete to the site. A mechanic’s lien can attach to your house when a subcontractor or supplier goes unpaid, even though you paid the general contractor in full. The waiver is a one-page form, it costs nothing to ask for, and it closes the last route by which someone else’s unpaid invoice becomes your problem. Ask for it as a condition of the final draw and keep it with the contract file.

Frequently asked questions

What should I check before hiring a foundation contractor?

Verify the licence number with the state board, ask for a certificate of insurance naming you as certificate holder, and confirm workers compensation coverage for the crew on site.

How much deposit should a foundation contractor ask for?

A deposit under one third of the contract price is normal. A demand for half or more before materials are ordered is a warning sign, especially on a job under $20,000.

Does a foundation contractor need to be an engineer?

No. Contractors install systems; engineers design them. The best arrangement is an independent engineer's report that the contractor bids against, so the design and the installation are separately accountable.

What should a foundation repair contract include?

Pier count, spacing, design depth, method, permit responsibility, payment schedule, start and completion dates, warranty terms, and a change-order process with fixed unit prices.

Are foundation contractors required to carry insurance?

Most states require general liability and workers compensation for construction contractors. Ask for certificates and verify them with the insurer rather than accepting a photocopy.

What if the contractor damages my landscaping?

Protection and restoration should be written into the scope. If landscaping is excluded, photograph the yard before work starts and agree in writing on what will be restored.

Sources

D
Owen Brady
We read manufacturer documentation, compare the numbers, and publish what the sources actually say. Last reviewed November 9, 2026. How we research →

Some links are affiliate links.If you buy through them we may earn a commission at no extra cost to you. We do not accept payment for rankings. Read the full disclosure.